Transport

New railway overpass opened between Sabir Rakhimov and Urtaaul stations

Illustration: Tezkun / AI. Not a photograph of the event.

JSC Uzbekiston Temir Yullari has put into operation a railway overpass on the Sabir Rakhimov - Urtaaul section. This was reported by the press service of the railway company.

A ceremony to open the facility was held on October 3. The structure was built to streamline traffic flows at the junction of Tashkent and Tashkent region, in place of the former crossing at the 3384th kilometer (PK-2). The event was attended by the hokim of Tashkent region Z. Mirzaev, the head of Uzbekiston Temir Yullari Z. Narzullaev and transport prosecutor I. Narimov.

During the project, a two-track railway bridge with a length of 23.6 meters was erected, and the tracks were returned to their design position. Also, a bypass railway branch and a road with a total length of 1200 meters were equipped, and 800 meters of contact network were completely relaid. For the foundation of the enclosing walls, builders installed 237 bored piles and used over 11 thousand cubic meters of concrete.

The total volume of earthworks reached 60 thousand cubic meters. At the facility, water drainage systems were installed, including two drainage pipes for rain and melt water, as well as automobile and pedestrian paths were laid.

Узбекистон темир йуллари · Telegram post, 3 October 2026, 09:48

Введен в эксплуатацию новый современный путепровод на участке «Сабир Рахимов – Уртааул»

Open in Telegram

What it means

The overpass is open to traffic on the border of Tashkent and Tashkent region, which is designed to reduce traffic jams and redistribute traffic for residents of the Zangiata district and transit drivers.

Published 3 October 2026, 14:01 · No updates · Russian original

Discussion
  1. Loading comments…
No links or insults. One comment per 20 seconds.

Comments on this story live under its post in our Telegram channel. Comment on Telegram