Transport

Railway tracks repaired on Chashma – Okrabot section

Illustration: Tezkun / AI. Not a photograph of the event.

On September 25, technical work was carried out in the Karshi regional railway junction to reduce track curvature, the press service of the Karshi regional railway junction reported.

The work was organized in accordance with Order No. 322-UKh issued by the chief engineer of JSC Uzbekistan Railways, Sh. T. Kodirov.

Repairs involving heavy track machinery took place on the section between the Chashma and Okrabot stations — along the stretch from picket 9 of kilometer 93 to picket 8 of kilometer 94. As specified by the junction's press service, the technical "window" was conducted according to the approved schedule to improve the technical condition of the infrastructure and ensure train traffic safety.

Узбекистон темир йуллари · Telegram post, 26 September 2026, 08:17

Joriy yilning 25-sentabr kuni Qarshi mintaqaviy temir yo‘l uzelida temir yo‘l infratuzilmasining texnik holatini yaxshilash, harakat…

Open in Telegram

Sources

This article was prepared with the help of AI and translated from the Russian original. Spotted an error — let us know.

Published 26 September 2026, 15:16 · No updates · Russian original

Discussion
  1. Loading comments…
No links or insults. One comment per 20 seconds.

Comments on this story live under its post in our Telegram channel. Comment on Telegram